A new exhaust hood system was installed for a 300 sq ft Commercial Kitchen at Moravian College Book Store. 

Project Highlights

  • A fire rated chase was installed which required removal of existing wood framing at the roof and concrete deck above to create the chase.
  • Structural steel was required to support the concrete deck above.
  • Timing was crucial for the new tenant to gain occupancy.