Preparations for a New MRI Machine: Exterior Renovations Included

In anticipation of the installation of a new MRI machine, both interior and exterior renovations were required at the site.

Project Highlights

  • Aged facility made the project challenging as MRI was to go in the basement.
  • JCS worked with MRI manufacturer to ensure a seamless installation.
  • Opening was designed to allow the machine to be lowered into the facility, retaining walls and railings were installed.
  • Existing electrical and HVAC piping had to be relocated to allow for MRI shield clearance.
  • Existing concrete slab was removed and repoured for new MRI equipment.