This  15,000 sq ft commercial building was completed in 5 phases while occupied with guests. Jerdon Construction Services worked closely with LVHN as additional work was needed. Several challenges presented themselves during construction; however, JCS was able to complete the project on time and on budget.

Project Highlights

  • New finishes throughout both floors.
  • 1st floor required moisture mitigation due to high levels of moisture coming from the existing slab.
  • Fire system was put on test on a daily bases during construction.
  • Power was cut during construction for additional changes requested.
  • 2nd floor rooms had extensive water damage to the subfloor which required removal and patching.
  • Project was completed in 5 phases while occupied with guests.