This 15,000 sq ft commercial building was completed in 5 phases while occupied with guests. Jerdon Construction Services worked closely with LVHN as additional work was needed. Several challenges presented themselves during construction; however, JCS was able to complete the project on time and on budget.
Project Highlights
- New finishes throughout both floors.
- 1st floor required moisture mitigation due to high levels of moisture coming from the existing slab.
- Fire system was put on test on a daily bases during construction.
- Power was cut during construction for additional changes requested.
- 2nd floor rooms had extensive water damage to the subfloor which required removal and patching.
- Project was completed in 5 phases while occupied with guests.