
The Trumbower Hall project was a single-phased lab renovation in an occupied building. This project involved demolition, casework, refinishing hardwood flooring, new acoustical ceiling tiles, electrical, plumbing, and HVAC. Project included installation of fume hoods and epoxy countertops. Plumbing, data and electric had to be run to the third floor.
Project Highlights
- Extensive coordination with subcontractors.
- Maintaining existing wood flooring, patch where needed and refinish.
- Casework had to be built on site due to existing conditions.
- All mechanical, plumbing and electric were challenging due to the age of the building.
- Lab setting required special plumbing due to chemicals being used.
- Jerdon performed work while students occupied the building.